Skip to content
  1. Gesthorm
  2. Frequently asked questions

Frequently asked questions

Frequently asked questions about the Gesthorm concrete ERP

What concrete plants ask us most before getting started with Gesthorm, the concrete ERP.

Frequently asked questions

What people ask us before getting started

Can't find your question? Write to us using the form and we'll get back to you very soon.

Or call us directly+34 959 54 07 12
Which concrete plants does Gesthorm integrate with?

We currently integrate with every brand of concrete batching plant. Arco by Arco Electrónica, Kobetón by Frumecar, Software PCD by Horus, GestecNet by Leca and Conex by Proin are some of the manufacturers and concrete plant management software packages that Gesthorm integrates with, centralising all the data in one place.

What information is exchanged automatically with the plants?

We import sales delivery notes, consumption and purchases from the plants, and we export the customers, sites, vehicles, hauliers and drivers registered at the office to the plants' loading software.

Is Gesthorm invoicing VeriFactu-compliant?

Yes. It includes an invoicing system that meets all the requirements of article 29.2.j of Ley 58/2003, General Tributaria (Spanish General Tax Act) and the provisions of the Reglamento de Requisitos de Sistemas de Facturación (RRSIF, the Spanish regulation on invoicing systems).

Can I check the information from any device?

Yes. Thanks to the latest technology in our software, you get detailed information about your business in powerful dashboards, giving you full control over what is happening at your concrete plants. All in one place you can check average collection period, customer credit risk, sales, purchases, profitability, consumption, mass balance and much more.

Does it include accounting?

Yes. Complete integrated accounting, with export of sales invoices and collections to external accounting software.

Can it adapt to my company's specific needs?

Yes. We adapt it to the customer's specific requirements when needed. Gesthorm is not meant to be a tool that forces you to adapt to the way it works: it is open to being modified, extended and tailored to your company's needs.

What if I also run an aggregates plant?

Arigest handles the complete management of an aggregates plant, including delivery notes and invoicing for material purchases and sales. Synchronised with electronic weighing equipment that tracks the tonnage coming in and going out at any moment, the application automatically generates the corresponding delivery notes and all the related invoicing.

Do I have to change the plant's software?

No. Gesthorm works with the loading software each plant already has, whatever the manufacturer.

What information is exchanged?

From the plant to the office: sales delivery notes, consumption and purchases. From the office to the plant: customers, sites, vehicles, hauliers and drivers.

Does the plant need an internet connection?

To work in real time, yes. If the connection isn't good, the information can be transferred by importing and exporting files.

Does it work if each plant has a different batching controller?

Yes. Gesthorm centralises several plants in the same database even if they use different types of batching controller.

Where does Gesthorm get the raw material cost from?

From the incoming delivery notes. Each one stores the cost of the material purchased and of its haulage.

How much does a cubic metre of concrete cost at my plant?

It depends on the mix design and on what you pay for raw materials and their haulage in each purchase. Gesthorm calculates it for each mix design using your incoming delivery notes.

Does the cost per cubic metre update itself?

Yes. It is recalculated as raw material and haulage costs change with new deliveries.

Can I see the profitability of each site?

Yes. Each site shows its deviation from the quote and its actual profitability.

Can I create my own reports?

Yes. A wizard lets you choose fields, filters, sort order and totals, save the report and export it to Excel.

Can I invoice all the customers of a plant at once?

Yes. You choose the plant and the period, click “Invoice” and the wizard invoices all the customers of that plant.

Can I create invoices manually?

Yes, from delivery notes or for free-text items. Pro forma invoices too.

Do invoices go through to accounting?

Yes. Gesthorm has complete integrated accounting and also exports sales invoices and collections to external accounting software.

Does it help me check hauliers' invoices?

Yes. It forecasts the invoices from concrete and raw material hauliers, and from suppliers, so you can compare them with the ones you receive.

Can I run several plants with batching controllers from different brands?

Yes. Gesthorm is ready for companies with more than one plant, even if they use different types of batching controller.

Where is each plant's information stored?

In the same database, accessed over the internet, or by importing and exporting files.

Is stock tracked per plant?

Yes. Gesthorm controls the stock of each raw material at each plant.

Can I limit what each user sees?

Yes. There is user access control and permissions for each screen.

How are debtor days calculated in Gesthorm?

Gesthorm calculates them automatically for each customer from the invoices it issues and the ones it collects, without doing the sums in a separate spreadsheet.

How does Gesthorm calculate a customer's credit risk?

Automatically, based on the invoices issued and the ones collected.

Can I see risk by sales rep?

Yes. The current risk report can be viewed by customer, by month, by sales rep and by type.

Can I see the risk when preparing a quote?

Yes. When you prepare the quote, Gesthorm gives you the prices, the theoretical profitability and the customer's maximum risk.

Can I check it on my mobile?

Yes. The dashboards can be viewed on any device with internet access.

What is the mass balance in Gesthorm?

The comparison between raw material deliveries and what the outgoing delivery notes consume, to see whether they match.

Do raw material deliveries have to be entered by hand?

No. Incoming delivery notes are captured automatically from the batching controller.

Is the stock valued?

Yes. Gesthorm tracks the stock of each raw material at each plant, along with its valuation.

Does it track fuel?

Yes. It keeps track of fuel tanks and the supplies made.

Does Gesthorm record crushing tests on concrete test specimens?

Yes. It includes records of crushing-test quality controls, and those controls are tracked against the outgoing delivery notes.

Where can I see the result of each quality control?

On the delivery note: Gesthorm shows the control results automatically, together with the raw materials used in production.

Do I have to type in the delivery notes to record crushing tests?

No. Outgoing delivery notes arrive on their own from the batching controller, with their raw material consumption.

Can I list all the loads of a mix design?

Yes. With custom reports you choose fields, filters, sort order and totals, and export it to Excel.

Does Gesthorm replace the testing laboratory?

No. The tests are carried out by the laboratory; Gesthorm helps you keep each result together with its delivery note and its mix design.

Does Gesthorm manage concrete delivery?

Yes. It keeps track of vehicles, drivers, concrete hauliers, their haulage rates and their invoices.

And raw material haulage?

That too. Each incoming delivery note stores the haulage cost based on the haulier that made the trip, and Gesthorm keeps track of raw material hauliers and their invoices.

Can I compare what each haulier charges me?

Yes. Gesthorm forecasts the invoices from concrete and raw material hauliers so you can compare them with the ones you receive.

Do I have to register vehicles at each plant?

No. The vehicles, drivers and hauliers you register at the office are sent to the plants' loading software.

Is haulage included in the cost of concrete?

Yes. The cost of each mix design per cubic metre is updated with changes in raw material and haulage costs.

What is a dashboard in Gesthorm?

A screen with your business indicators (debtor days, customer credit risk, sales, purchases, profitability, consumption or mass balance) so you can see them at a glance.

Where can the dashboard be viewed?

On any device with internet access: a computer, a laptop or a mobile.

Does the data have to be prepared by hand?

No. It comes from what Gesthorm already records: the delivery notes arriving from the batching controller, invoices and collections.

Can I see a demo of the dashboards?

Yes. The website has a data analysis demo published in Power BI, with sample data.

What if I need a report that isn't there?

With custom reports you choose the fields, filters, sort order and totals, and export it to Excel. Gesthorm also adapts to each company's specific requirements if needed.

Is Gesthorm suitable for a precast concrete factory?

Yes. It is an ERP built specifically to manage and control the production process of ready mix concrete, quarry and precast products, including materials management for precast production.

Which part of the factory does it cover?

Materials management (suppliers, purchasing, valued stock, mass balance and mix designs with their cost) and the administrative and financial side: sales, invoicing, collections, credit risk and accounting.

Does it calculate the cost of the concrete I produce?

Yes. Gesthorm stores each mix design with its raw material composition and calculates its cost per cubic metre produced, updated with every purchase.

Can it be adapted to how my factory works?

Yes. Gesthorm is open to being modified, extended and tailored to each company's needs. We'll look at it with you in the demo.

All features

Connection with the plants

Delivery notes from the batching controller reach the office on their own, and records created at the office reach the plant on their own.

Cost per cubic metre

Every mix design with its cost per cubic metre, kept up to date with what you pay for raw materials and their haulage.

Invoicing with Veri*Factu

Three wizards to invoice the delivery notes of one customer or of an entire plant, or to print everything, with Spain's Veri*Factu.

Several plants

All your plants in the same database, even if each one has a different batching controller.

Risk and collections

Each customer's credit risk and debtor days, calculated automatically and in real time.

Mass balance and stock

Making sure raw material deliveries match what the delivery notes consume, plant by plant.

Concrete delivery

Vehicles, drivers and hauliers, with their costs and a forecast of their invoices.

Dashboards

Collections, risk, sales, purchases, profitability and consumption at a glance, on any device.

I'd like a Gesthorm demo

Any other questions?

Tell us how you work and we'll get back to you, or show you Gesthorm in a no-obligation demo.

Request a demo