Concrete Plant KPIs: What to Review Every Month

The sales, cost, raw material, transport, quality and collection KPIs worth reviewing monthly at a concrete plant, and how to calculate each one.

Gesthorm team · Infonet Consultores5 min read

Gesthorm main screen showing the menu and the concrete plant modules

In many plants, the first thing people look at at the end of the month is how many cubic metres have been sold. It is a useful figure, but it does not tell you whether you have made any money, whether the raw materials add up or whether some customers are starting to stop paying. This article suggests a short list of KPIs, grouped by area, with how to calculate each one and what warning sign to look for. You do not need to track them all from the first month: start with the ones that worry you most and add more as you go.

Sales: how much and to whom

  • Cubic metres sold, by plant and in total, compared with the same month of the previous year. Comparing with the previous month is misleading because of seasonality.
  • Average selling price per cubic metre: concrete revenue divided by cubic metres. If it falls, check whether it is down to discounts or to selling more of the cheaper types.
  • Sales by customer: how much weight the top customers carry in the total. Relying heavily on a few customers is a risk.
  • Sales by product: which designations sell the most and how the mix changes.

Costs and margin: whether you have made money

  • Raw material cost per cubic metre, by mix design, using actual purchase prices and their transport.
  • Gross margin per cubic metre: average price minus average cost. It is the KPI that best sums up the commercial health of the plant.
  • Gross profit for the month and how it has evolved compared with previous months.
  • Profitability per job: jobs that deviate from the quotation, in price or in product mix.

The typical warning sign is a margin that slips little by little without anyone having changed prices: it may be that raw materials have gone up and this has not been passed on to the mix designs or the price lists.

For the margin to be reliable, the cost has to be calculated using the price of the latest raw material purchased and the actual batching of each load, not a cost rate fixed at the start of the year. It is also worth looking at it by customer: a large customer on tight pricing may be dragging down the average for the whole plant.

Raw materials: what comes in must match what goes out

  • Mass balance by raw material and plant: the month's deliveries against the consumption on the delivery notes, along with the change in stock. A difference that keeps recurring points to weighing equipment, mix designs or deliveries that have been recorded incorrectly.
  • Valued stock at the end of the month: how much money you have tied up in silos and stockpiles.
  • Actual versus theoretical consumption of cement and admixtures per cubic metre.
  • Supplier invoices versus deliveries: what has been invoiced should match what has been received.

The mass balance is the KPI that is hardest to put together by hand, because it requires collating all the month's deliveries and all the consumption. If it generates itself, it becomes the most useful control in the plant: a miscalibrated weighing system or a wrongly configured mix design shows up here before anywhere else.

Operations: transport and quality

These KPIs explain a good part of the costs that do not appear in the mix design. Review them by plant if you have several, because an overall average can hide the fact that one plant is doing well and another is not.

Transport

  • Transport cost per cubic metre, in-house and subcontracted.
  • Cubic metres per trip: frequent part loads make transport more expensive.
  • Returned concrete: cubic metres and number of returns, by reason and by job.
  • Waiting times on site, if you record them: average time and the jobs with the longest waits.
  • Fuel: litres supplied against trips or kilometres.
  • Haulier invoices versus expectations based on the trips made.

Quality

  • Strength results from production control by concrete type, with their mean and dispersion.
  • Low acceptance test results reported by the sites, and their cause once investigated.
  • Rejections on site due to consistency or time limit.
  • Outstanding periodic tests: those due according to the schedule that have not been carried out.

Collections and risk: the money still to come in

  • Average collection period, overall and by customer. If it lengthens month after month, the plant is financing its customers.
  • Current risk per customer: what has been invoiced and not collected plus what has been supplied and is pending invoicing. Compare it with the limit you gave them.
  • Risk per salesperson: who has the most exposed portfolio.
  • Returned payments for the month: they can be the first warning of a customer in difficulty.

A useful summary for the monthly meeting fits in a table:

AreaMain KPIQuestion it answers
Salesm³ sold and average priceHow much we sell and at what price
MarginGross margin per m³Whether we make money on every cubic metre
Raw materialsMass balanceWhether what comes in matches what goes out
TransportCost per m³ and returnsHow much it costs to deliver and how much comes back
QualityStrengths and rejectionsWhether the concrete complies
CollectionsAverage collection period and riskWhen and how much we will collect

How to make sure the review does not stay on paper

  1. The same day every month and the same tables, so you can compare without redoing anything.
  2. One person responsible per area to explain any deviations.
  3. One action per deviation, with a date, to be reviewed at the next meeting.
  4. Data that generates itself: if someone has to spend two days putting the report together, it will eventually stop being done.

KPIs in the Gesthorm dashboards

Gesthorm offers dashboards you can consult from any device, with the average collection period, customer risk, sales, purchases, profitability, consumption and the mass balance, among others. You get reports on current risk by customer, by month, by salesperson and by type, on average collection period with invoiced and uncollected amounts, on sales and gross profit by period, and on delivery notes by customer and by product.

The data comes from the delivery notes sent by the batching plant and from invoicing, so there is no need to build the report by hand. For anything not covered by the reports, custom listings can be exported to Excel. See risk and collections, mass balance and stock and the Gesthorm home page.