-
· 8 min read
Invoicing control at a concrete plant: monthly checklist
Invoicing control at a concrete plant: how to reconcile delivery notes, site prices and invoices each month before sending them, step by step.
-
· 5 min read
Price per Cubic Metre of Concrete: How a Plant Works It Out
Price per cubic metre of concrete: what goes into it at a plant and how to set it per job using the real cost of each mix and of transport.
-
· 5 min read
XC4 exposure class and X classes for concrete (Código Estructural)
What XC4 and the other X exposure classes mean under the Código Estructural, which replaced the EHE-08, and what changes in paperwork, testing and delivery notes.
-
· 6 min read
Concrete Quality Control: Test Cylinders and Break Results
How samples are taken, how many cylinders are broken and when, how to read the results and what a plant should do when a break result comes back low.
-
· 5 min read
Concrete Plant KPIs: What to Review Every Month
The sales, cost, raw material, transport, quality and collection KPIs worth reviewing monthly at a concrete plant, and how to calculate each one.
-
· 4 min read
How to Prepare a Concrete Tender for a Large Construction Project
What to check in the specification, how to cost each concrete mix and the haulage, which terms to put in writing and how to assess customer risk.
-
· 5 min read
Precast Concrete Plant: Production and Stock Control
How to organise production and stock in a precast concrete plant: consumption per unit, batches, curing, inventory and the delivery sheet required for precast elements.
-
· 4 min read
Concrete admixtures: how to control their use and cost
How much admixture your plant really uses, what it adds to the cost of each cubic metre and where it gets lost, with the limits set by the Código Estructural.
-
· 4 min read
Concrete Mixer Waiting Time on Site: How to Control It
How to measure the time a mixer truck spends idle on site, what it costs you, how to agree it with the customer and what to do to keep waiting times shorter.
-
· 5 min read
Concrete Delivery Note: Mandatory Data (Código Estructural)
What data each concrete load's delivery note must carry under Annex 4 of Spain's Código Estructural, who checks it and the most common mistakes.
-
· 5 min read
Returned Concrete: How to Track It and Cut It Down
Why concrete comes back to the plant, what each returned cubic metre really costs, how to record it properly and which measures help reduce returns.
-
· 5 min read
HA-25/B/20/IIa: what it means and how to write it today
What each part of HA-25/B/20/IIa means, how it is written today with the Código Estructural X exposure classes (e.g. XC2), and which ordering mistakes to avoid.
Contact us
If you'd like more information or a no-obligation demo, fill in the form below
- Landline+34 959 54 07 12
- Mobile+34 621 39 39 47
- Where we areCalle Lentisco 3, oficina 13 · 21001 HuelvaView on map











